Waste & Wastewater

Challenge:

Ambassador was contracted under an instrumentation & controls contractor for a large water and waste water treatment plant project, providing custom PLC and SCADA programming as defined in the project specification.

Ambassador’s Solution:

Ambassador was responsible for the installation and testing of software, and start-up operations of a complete control system as indicated by the municipality. The system was designed to be integrated with the client’s existing top-end topology, and was configured to operate over an open system architecture.

Control functions included digital logic control, PID control, analog scaling and set point control, and peer to peer communications.